Electromagnetic utility locating
Active, passive and blind-search tracing of power, comms and metallic mains, marked on the ground and classified QL-B or QL-C.
Utility locatingAS 5488 subsurface utility information · Sunshine Coast & SEQ
Foresight Subsurface investigates, classifies and records buried services for designers, contractors and asset owners. Every mark on the ground and every line on the plan states its AS 5488 quality level — so you know exactly how much to trust it.
Active, passive and blind-search tracing of power, comms and metallic mains, marked on the ground and classified QL-B or QL-C.
Utility locatingFinds the services EM can’t — PVC, PE, asbestos cement and abandoned assets — with honest advice on what the ground will and won’t allow.
GPR surveysStructured QL-D to QL-A investigations scoped around the design decision they have to support, delivered in the formats your team uses.
SUENon-destructive verification that lifts critical assets to QL-A — position, depth and material confirmed by sight, not inference.
PotholingGPR scanning of slabs and concrete before you cut, core or drill — locating reinforcement, conduits and voids so the penetration goes where it is safe.
GPR & concrete scanningAS 5488 classifies subsurface utility information by how it was obtained. Most mark-outs stop at a line of paint. Ours tell you which rung of the ladder each asset sits on — and what it would take to move it up one.
| Level | Name | What it means |
|---|---|---|
| QL-A | Verified | Potholed and physically sighted. Position, depth and material confirmed to ±50 mm. |
| QL-B | Traced | Reliable electronic location. ±300 mm horizontal and ±500 mm vertical tolerance. |
| QL-C | Inferred | Identified from surface features where a reliable trace couldn’t be achieved. |
| QL-D | Recorded | Identified from plans and records only. No positional accuracy implied. |
A locate is only as useful as the record it leaves behind. Alongside the field mark-out you receive survey pickup and digital output in the formats your design team works in — CAD and GIS files — DWG, DXF, 12dxml, shapefile and PDF — with the quality level recorded against every asset.
Defensible, quality-levelled utility data for concept and detailed design — fewer redesigns, fewer surprises in the corridor.
Pre-excavation clearance and QL-A verification where the strike risk is real: HV crossings, major mains, tight easements.
Accurate records of what you actually own and where it actually runs — a permanent improvement, not a one-off mark-out.
We confirm the work area, the decision at stake and the quality level each asset needs. No over-scoping, no under-scoping.
BYDA plans and records review, a site walkover, then systematic EM and GPR sweeps of the designated area.
Where certainty matters, potholing confirms position, depth and material and lifts the asset to QL-A.
A deliverable with stated quality levels, in the format your team uses, walked through with you before we leave it with you.
A BYDA enquiry gives you asset owner plans — and those plans can be out of date. A Foresight locate complements BYDA; it never replaces it. Always lodge a BYDA enquiry before excavating.